Client: City of Casa Grande, design bid build � Willmeng Construction
Location: Casa Grande, Arizona
Design of a complete new data center for the City. A new 24KW UPS was installed which is upgradeable to 60KW with the ability to add a second redundant system for future growth needs. The HVAC was completed via new 20 Ton Liebert CRAC unit with the provisions for the installation of a future 20 Unit. A 125KW/156kva Generator was installed to provide long term backup power for the facility.
Client: City of Sedona �Design Bid Build
Location: Sedona, Arizona
Design of a new data center in a new office facility in Sedona. A new 12KW UPS expandable to 60KW was installed in the new data center. An ATS was installed with provisions for a future generator with and wiring connects for a roll in temporary generator. The HVAC was a new 5 Ton Challenger CRAC unit with future provisions for a second and future redundant third unit.
Client: Highwinds Network Group
Location: Phoenix, Arizona
Design of a new NOC in an existing data center facility. New lighting, power and data systems were installed and were powered off the existing data center emergency power systems to provide reliable power for the critical network operations control center.
Client: Highwinds Network Group and PureGig
Location: Phoenix, Arizona
Design of ongoing data center changes and additions, continual upgrades to the UPS, Generator and HVAC system. The facility is located with a multi story high rise facility with generators and Chiller plant located in an attached parking structure.
The facility provides many ongoing challengers that a typical data center would not have with modifications requiring coordination with the tenants needs and building facilities personnel to complete the designs, taking into account the requirement of both parties.
Client: Titan Power, Inc. Design build Titan Power Inc.
Location: Gilbert, Arizona
STE studied the three existing 3000A, 480V, 3 phase, Service Entrance Sections (SES) and the facilities power usage, need for emergency power and its reliability. STE determined that the facility was using less then 50% of the available electrical capacity and that there were substantial utility penalties for under utilization. We were able to analyze the loads and consolidate the three services into two SES�s and reduce the ampacity of each to 1600Amps. The two remaining SES�s had 1600A ATS�s cabinets installed which connected the facility to a new 1750KW standby emergency power generator. The owner reduces his electrical cost, saved penalty fees and the two tenants, Godaddy and B of A both received adequate reliable back up power systems.
Client: Banner Health IT Department
Location: Various Valley Hospitals
STE was hired to review various projects that were under design and construction to verify that the new facility designs were appropriate for the applications. Several of the new hospital MDF and IDF room designs were determined to be �over-designed, extremely complicated and without the desired reliability that Banner needs for there IT systems. STE scheduled meetings with Banner IT, networking, security, TV and other systems personnel. We went through each of there needs and power requirements room by room, equipment by equipment to develop realistic power needs for each MDF and typical IDF room.
STE was then contracted to develop a prototype design with various options that could by used and modified for each new facility. Two different yet similar designs were developed with various possible options accounted for. The resulting designs were very reliable, cost effective and extremely flexible for the clients needs.
Client: Oddoneto Construction/David B. Howell Design Build
Location: Morenci, Arizona
STE designed an emergency generator power distribution system for the Morenci mining facility to provide power for the existing Data Center and a new Operations Command Center. STE was also retained to design the Command center and to provide a power and HVAC renovation of the existing data center.
Client: Oddoneto Construction
Location: Safford, Arizona
STE designed an emergency power generator system for the Safford mine along with replacing and upgrading the existing UPS system to provide redundant UPS systems, new three phase power distribution system and redundant power at the racks.
Client: Smith Group Medical, Design Bid Build
Location: Gilbert Arizona
Design of a new ground up, stand alone, 2 story building of approx. 20,000 sf. The facility includes exam rooms, infusion rooms, lab space along with an �Electa� Linear Accelerator vault with provisions for a second, Linear Accelerator vault, CT and Digital Radiation equipment.
Client: Smith Group Medical
Location: Mesa, Arizona
Building addition of approx 6000 square foot of medical office space. The project includes a new Electa Linear Accelerator and new PET/CT scanner.
Client: Smith Group Medical - Design Bid Build
Contractor: IBC Southwest
Location: Scottsdale, Arizona
9000 SF Medical office build-out of an existing shell building with a new PET/CT and Varian Linear Accelerator Vault.
Client: Smith Group Medical - Design Bid Build
Contractor: IBC Southwest
Location: Phoenix, Arizona
9500 SF medical office build-out of an existing shell building with a new PET/CT. The project also included a building addition for a Varian Linear Accelerator Vault.
Client: Project Development Resources, design build
Contractor: Project Development Resources
Location: Phoenix, Arizona
5000 SF medical office tenant improvement. The project includes Ultra Sound, Bone Density, Mammography and Stereo Biopsy rooms.
Client: Project Development Resources, design build
Contractor: Project Development Resources
Location: Phoenix, Arizona
Design for new Digital X-Ray and Mammography equipment.
Client: Project Development Resources, design build
Contractor: Project Development Resources
Location: Phoenix, Arizona
4000 SF Renovation to accommodate new Digital Fluroscopy and Ultra Sound Equipment.
Client: David B. Howell, Design Bid Build
Contractor: Guthrie General
Location: Phoenix, Arizona
Demolition of existing patient rooms in the Hospital to be converted to an outpatient imaging center. The facility includes new MRI, CT and Digital x-ray equipment.
Client: David B Howell
Location: Bullhead City, Arizona
New building addition to an existing imaging center. The new addition includes a new MRI and control room.
Client: David B. Howell
Location: Bullhead City, Arizona
Relocation of these existing functions which had been located in the basement to the second floor. The basement area was converted into administration offices.
Client: Guthrie General, Design Build
Location: Kingman, Arizona
10,000 SF tenant building out of an existing shell building. The imaging center included a MRI, CT and Digital x-ray equipment.
Client: Guthrie General, Design Build
Location: Phoenix, Arizona
New Siemens 1.5 T Magnet located on the Second Floor.
Client: Premier Oncology, Design Build with Opus Construction
Location: SRPMIC, Arizona
The Build out of approximately 27,000SF of shell building space into a state of the art Oncology research center with infusion areas, pharmacy, labs, blood draw, exam rooms and associated doctor offices and administration spaces.
Client: Guthrie General, Design Build
Contractor: Guthrie General
Location: Sun City, Arizona
New Wound Care department located on the Second Floor in the facility which included two new Hyperbaric Chambers.
Client: Smith Group
Contractor: Jokake Construction
Location: Glendale, Arizona
The existing medical facility was renovated in phases for a total remodel of the existing office/medical space while remaining in operation The final phase of the renovation included the installation of a new CT and the addition of a second Linear Accelerator vault.
Client: Devenney Group, Ltd
Contractor: Layton Construction
Location: Chandler, Arizona
Converted existing waiting room and recovery area into a new twelve bed triage area for the OB department..
Client: Devenney Group Ltd.
Locations: Mesa, Arizona and Surprise, Arizona
Converted two existing long term rehabilitation facilites into a licensed hospital.
Client: SSOE, Design Bid Build
Contractor: IBC Southwest
Location: Phoenix, Arizona
Renovation and infill of an existing traffic court facility into an �I� occupancy state of the art outpatient surgery center. The facility included doctors exam and office areas. The surgery area included patient recovery beds, two operation rooms plus a procedure room and a PACU and associated nurses station.
Client: David B. Howell Design Bid Build
Contractor: Ryan Companies
Location: Phoenix, Arizona
The renovation of an existing procedure room into a second larger operation room and associated increase in patient recovery beds. Existing administration functions were relocated to a new space within the facility to accommodate the surgery modification.
Client: Devenney Group Ltd � Design build � DPR Construction
Location: Glendale, Arizona
The project was the renovation of existing patient and OB Triage departments. Most of the third floor of the hospital was renovated and a building addition was included expand the existing OB triage by approx, 40%. The renovated space included a new larger well baby nursery along patient rooms being converted to continuing care nursery rooms, renovation of the nurses station, med rooms, and the addition of a second nurses station for the continuing care nursery area, new isolation room and new C-section recovery rooms.
Client: Devenney Group Ltd. � Design Build
Contractor: DPR Construction
Location: Glendale, Arizona
The project was the demolition and expansion of and existing Operating room which was reconstructed as a new Special Procedures Operating Room incorporating a new Phillips Catherization unit with laminar flow HVAC, specialty surgery lighting, three monitor booms and two Stryker light booms.
Client: Devenney Group Ltd � Design Build
Contractor: DPR Construction
Location: Glendale, Arizona
The existing Cath Lab was demolished and reconstructed to incorporate a new Phillips Cath/EP unit with new control station and lighting.
Client: Specified Electrical Contractors
Location: Avondale, Arizona
Electrical Engineering and design for a new 5 story 125,000 SF class A shell office building.
Client: Specified Electrical Contractors
Location: Avondale, Arizona
Electrical engineering and design of a new 5 story 600 Car parking structure to be shared by a new office complex, attached retail center and adjacent resort.
Client: JWA � Design bid build
Location: Flagstaff, Arizona
Design of a new 12,000 SF warehouse, flex space manufacturing facility.
Client: WLG
Location: Flagstaff, Arizona
Design of a new lighting layout to replace the existing lighting system which did not function properly for the facility.
Client: Viking Electric �Design Build with Arco Construction
Location: Surprise, Arizona
The project was a new 288,000sf ground up facility. The facility included appox 12,000sf new office layout, 20,000sf refrigerated warehouse with th balance of the facitlity warehouse, fork lift charing and packaging equipment. The faqcility was designe to receive delivers by rail on the west an truck dock distribution system on the north and east sides of the facility.
Client: Architectural Concepts
Contractor: Chanen Construction
Location: Peoria, Arizona
New poolside restaurant and pool equipment building.
Client: Architectural Concepts
Contractor: Chanen Construction
Location: Peoria, Arizona
Construction administrative services for a four story a 128 room time share facility.
|
|